Chiu, H N and Tsai, D M (2002) An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics, 20(01), 55-66.

  • Type: Journal Article
  • Keywords: multi-project scheduling; project management; resource constraints; net present value; heuristic rules
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446190110089718
  • Abstract:

    The main purposes of this study are to incorporate both the project delay penalty and early completion bonus into the objective function of the resource-constrained multi-project scheduling problem with discounted cash flows (RCMPSP-DCF) and to develop an efficient heuristic search scheduling rule. The effectiveness of the proposed heuristic rule is evaluated by comparing it with the optimal solution obtained by the optimal model for 42 small-scale problems. The result indicates that the solution obtained using the proposed heuristic rule is very close to the optimal solution, and that the proposed heuristic rule provides significant savings in computation time. Moreover, the proposed heuristic rule is also compared with four existing heuristic rules based on an experiment involving the single-project and multi-project scheduling problems. The results indicate that the proposed heuristic rule is superior to the four existing rules under the performance criteria of the average total project net present value and the average total project delay. In addition, the number of times that the proposed heuristic rule can obtain the best solution is also far more than that of any other rule considered in this paper under the two aforementioned performance criteria. Furthermore, this study has found that the performance of a heuristic scheduling rule is significantly affected by the number of projects. A rule that can lower the total project delay to the minimum is also able to maximize the total project net present value.

Drew, D S, Tang, S L Y and Lo, H P (2002) Developing a tendering strategy in two-envelope fee tendering based on technical score-fee variability. Construction Management and Economics, 20(01), 67-81.

Idrus, A B and Newman, J B (2002) Construciton related factors influencing the choice of concrete floor systems. Construction Management and Economics, 20(01), 13-9.

Loosemore, M and Chau, D W (2002) Racial discrimination towards Asian operatives in the Australian construction industry. Construction Management and Economics, 20(01), 91-102.

Radosaviljevic, M and Horner, R M W (2002) The evidence of complex variability in construction labour productivity. Construction Management and Economics, 20(01), 3-12.

Rahman, M M and Kumaraswamy, M M (2002) Joint risk management through transactionally efficient relational contracting. Construction Management and Economics, 20(01), 45-54.

Skitmore, M R (2002) Raftery curve construction for tender price forecasts. Construction Management and Economics, 20(01), 83-9.

Sterner, E (2002) 'Green procurement' of buildings: a study of Swedish clients' considerations. Construction Management and Economics, 20(01), 21-30.

Walker, D H T and Shen, Y J (2002) Project understanding, planning, flexibility of management action and construction time performance: two Australian case studies. Construction Management and Economics, 20(01), 31-44.